East Belleville YMCA Construction Update
YOSI Families,
New construction at the YMCA has drastically changed the route swimmers will take to reach the pool area.
There is now a wall separating the locker room areas from the YMCA entrance near the old Child Watch area.
After scanning in at the front desk, swimmers should:
➡️Turn right and enter the weight room area.
➡️Walk along the walkway down to the old multi-purpose room (now filled with workout machines).
➡️Continue through the workout room to the gymnasium.
➡️Turn left and walk toward the main gym doors.
➡️Exit the gymnasium at the water fountain area, then enter the locker rooms as usual to access the pool deck.
Directional signs have been posted throughout the YMCA to guide members through the maze to the locker room area.
We encourage you to walk the path with your child the first few times if they are unfamiliar with this route. Y staff can also help get them to the pool.
This phase of construction is expected to last approximately 3–4 weeks.
Thanks for your flexibility as we navigate this next construction phase together!