2010-2019
2010: Pointe-Claire finishes the construction of a massive facility upgrade, including a new 10 lane, 50 meter pool.
2010-2019
2010: Pointe-Claire finishes the construction of a massive facility upgrade, including a new 10 lane, 50 meter pool.